The Czech company Slož Dům assembles the rough structure of a family house from prefabricated parts in 13 days. The pilot house is going up in Obříství. According to company representative Jakub Káňa, four people manage it in two weeks, and making the parts takes four days.
The customer receives the whole shell of the house with a fully insulated roof and exterior walls. The windows are supplied by a partner firm, and the owner chooses colors and finishes. Káňa says: “Anyone can build a house. We have instructions in which every step is described precisely.” If a part is left over, a mistake has been made somewhere. By his estimate, an inexperienced person would manage in about three weeks with a helper.
The structure relies on LVL timber (laminated veneer lumber), PIR panels and magnesium oxide boards. The 17-centimeter exterior wall, according to the manufacturer, needs no additional insulation. The house falls into energy class A.
The kit for the pilot house costs 1.4 million crowns, and the whole turnkey house just under five million. That works out to roughly 10,000 crowns per square meter for the kit alone and 40,000 for the turnkey house.
Permits and structural calculations, as with other timber houses, are handled by an authorized designer. The house comes with a 15-year warranty. The manufacturer visits twice for inspections and checks for heat leaks with a thermal camera.
That said, this is a pilot project, so there is no long-term experience with living in such a house yet. “This house is our pilot project: we started six days ago and hope to finish within the next five,” Káňa says.
Around Prague, based on reporting by novinky.cz